• Brick Visual

    Brick Visual

  • Brick Visual

    Brick Visual

  • Brick Visual

    Brick Visual

  • Brick Visual

    Brick Visual

of

Residential

Lorcan O’Herlihy Architects unveil 410 North Rossmore renderings in California

The reconfigurations will include the addition of at least four floors with studio, one-bedroom, and co-living apartments, providing the building with attainable rental space

by Georgina Johnston 19 March 2021 Future Projects

Domos Rossmore LLC has concluded the second phase of the 410 North Rossmore project with the completion of new architectural renderings of the building. Domos worked closely with Lorcan O’Herlihy Architects (LOHA) to finalise design and development concepts for the reconfiguration of the property.

Domos Rossmore LLC have selected the final design from Lorcan O’Herlihy Architects for the classic 30s building at 410 North Rossmore in Hancock Park, California.

Our 410 Rossmore project represents a new paradigm and contribution for helping to address LA’s housing crisis. Not only does it carefully restore a classic 30s building but creatively weaves additional housing in and above this significant building. It also presents an alternative housing model, co-living. I believe co-living is part of the future of smart growth in Los Angeles.

Lorcan O’Herlihy, Founder, LOHA

The renderings showcase 60% traditional and 40% co-living units throughout the building with the ability to house 225 residents. In co-living suites, residents have private bedrooms and baths but share kitchen and living room facilities. Included in the new plans are a gym and amenity space on the ground floor, coworking extension spaces throughout the building and a pool, spa, lounge deck and event space on the roof. In addition, some of the floors incorporate open, outdoor living spaces.

410 North Rossmore, is adjacent to several internationally noted historic properties such as the El Royale and the Wilshire Country Club. John Labib and Associates has been hired to navigate the seismic safety upgrades of the building, adhering to the U.S. Secretary of the Interior's Standards for the Treatment of Historic Properties.

The project is slated to begin the construction phase in May of 2021 and will take approximately 22 months to complete. 


Want to submit your project to World Architecture News?

Contact The Team