Hong Kong’s LEED and WELL Platinum design by Zaha Hadid Architects

Working with the Henderson Land and Arup’s Building Sustainability Team, the Bauhinia bud inspired 2 Murray Road, 36 storey project replaces a multi-storey car park with an urban oasis adjacent to Chater Garden within walking distance to both Central and Admiralty MTR metro stations

by Georgina Johnston 27 September 2021 Tall Buildings

With its base elevated above the ground to shelter courtyards and gardens cultivated with trees and plants in the centre of Hong Kong’s central business district, the design, for Henderson Land, creates new civic plazas that are enveloped by nature.

Echoing the organic forms of the natural world; the redevelopment connects with the adjacent public gardens and parks. These tranquil outdoor areas flow into the generous communal spaces of the interior; the craftsmanship and precision of the curved glass façade enhance the connectivity between the building’s interiors and the surrounding gardens and the city beyond.

The design reinterprets the structural forms and layering of a Bauhinia bud about to blossom; known as the Hong Kong orchid tree, the Bauhinia x blakeana was first propagated in the city’s botanic gardens above the Murray Road site and its flowering bud features on Hong Kong’s flag.

At the core of the city’s financial district, the project is situated at the East-West and North-South junction of Hong Kong’s network of elevated pedestrian walkways; connecting directly with surrounding gardens, shops and restaurants as well as the offices of leading financial and civic institutions.

A high tensile steel structure provides a very wide span, up to 26m, of naturally lit, column-free, Grade A office space with a five-metre floor-to-floor height giving maximum flexibility; its vertical core is located on the eastern side of the building to optimise views of Chater Garden and the city’s renowned skyline to the West.

The design has achieved LEED Platinum and WELL Platinum precertification together with the highest Three Star rating of China’s Green Building Rating Program. The design, procurement and construction targets full certification at occupancy.

The building’s smart management system creates a contactless pathway for all occupants from the street to their workstation that eliminates direct contact with communal surfaces and includes AI-assisted lift controls. Using a mobile phone, contactless smart card or biometric recognition, occupants can enter the building and pass security, call lifts to their office floor and access other zones such as lounge areas and washrooms.

Arranged for access on multiple levels, the large double-height foyer at ground level welcomes staff and visitors with its interplay of natural light, planting and organic forms leading up to the second floor public lobby on the city’s elevated walkway network. Suspended above the canopy of its surrounding trees, the sculptural glass façade of this expansive lobby defines a variety of nested spaces, each refined for purpose and experience. 

Designed for intuitive navigation and to accommodate evolving patterns of working with enhanced workplace flexibility, the colour palettes of these finely detailed spaces differentiate key destinations within the tower.

Located on the refuge floor, the Sky Garden is an outdoor recreational space with a running track and an aquaponics planting network that acts as an effective biological air-purifying filter by consuming contaminants. 

The banqueting hall at the top of the tower offers panoramic views of the city’s surrounding skyline. Hosting a variety of public and corporate events, its glazed roof and façade will ensure this space becomes one of the city’s most memorable venues. 

Designed to withstand the region’s powerful summer typhoons, the façade is composed of four-ply, double laminated, double-curved insulated glass units, the first of their kind in Hong Kong, to effectively insulate the building and reduce its cooling load as well as build resilience.

Hybrid ventilation is controlled by the building’s automated management system and enables all office levels to be naturally ventilated. This natural ventilation can be supplemented when required with mechanical dehumidification and filtration to further enhance the indoor environment and air quality.

The building’s air quality monitoring system will detect the degree of occupancy in any interior and automatically adjust indoor air temperature, humidity and fresh air volume to meet demand. These smart-systems learn to accurately predict daily occupancy trends to optimise energy demand, ensuring increased efficiencies with lower energy consumption.

Two weather stations installed at street level and roof level will monitor real-time outdoor conditions including PM10, PM2.5, ozone, daylight, solar irradiation, wind speed, rainfall, temperature, humidity and noise. These weather stations will inform occupants of outdoor air quality and are connected to the building’s automated management system to adjust the tower’s hybrid ventilation as required, ensuring the optimum supply of high-quality outdoor air.

The redevelopment also incorporates a solar responsive ventilator (SRV) along the western perimeter of each floor to enhance the comfort of occupants. Powered by photovoltaics, the low speed, silent SRV creates a channel of air that has the ability to adjust solar radiative heat to the perimeter zone for further comfort.

A 26% reduction in electricity demand will be achieved with the use of smart chiller plant optimisation, high-efficiency HVAC equipment and daylight sensors that reduce artificial lighting during periods of sufficient natural light.

A top-down construction method is employed to accelerate the redevelopment programme onsite by implementing deep basement and above ground construction at the same time.

With construction works having begun in 2019 2 Murray Road aims to be completed by 2022.